    I completely agree with you Steve, it is now really uneven with big loose stones poking up. I would have expected them to grade the dip to provide some drainage but it was already starting to pool this morning.
    My thoughts on the new piece of cycle track is that it will get used by less than 10% of cyclists as it has tight bends and drops back right into the traffic line and is not wide enough to pass side by side. (anyone know if this was Campus Facilities or OCC?)
    Cheers
    Andy

    in reply to: Closure of road west of East Lockinge #5406
    Andy Male
    Member

    Hi Dan, I have ridden through at 8:30 both mornings as they are only getting ready to begin at that point. It is fine heading home as it is now dark and all works are completely wrapped up by that point.